The Desorption Canister is specially made for field
work. To hold the different coal case of 48/56/68/102 diameter. First
to Coal core an put into the Stainless Steel preformatted Cylinder.
The Cylinder diameter is very slightly more than coal core. The Cylinder
put in to the main Canister for heating upto 99.9°C. The Canister
is singly locket through cam lock with rubber gasket. To hold the pressure
up to 30 Kg/cm2 shown through a pressure gauge and Sluice Valve attached
for control to gas. The main Cylinder are heated as per requirement
which is controlled by Digital Controller (Very precision). Temperature
up to 99.9°C. The whole system made of Stainless Steel 304, the
system is very low wattage.
|
|
|
||
ESSER OIL LIMITED | ||
CENTRAL MINING RESEARCH INSTITUTE | ||
CENTRAL FUEL RESEARCH INSTITUTE | ||
GEOLOGICAL SURVEY OF INDIA | ||
GREAT EASTERN POWER CORP LTD | ||